Page 199 - Peterson 85 Years And Going Strong
P. 199

Ben Garner, Pat Good and the Portland weld shop
built the rest of the machines between June 2017
and October 2019. “Carl knew everything about
the project, and all we had were his notes—the
playbook,” says Garner, a 2016 ThinkBIG gradu-
ate. “When I took over, serial number 103, 104, and
106 were sitting in the shop waiting for cabs. The
first three had Cat cabs from the factory. When
Cat quit making them, we went to Pierce Pacific
cabs. The first one didn’t fit so we had to send it
back. The second one didn’t fit either but we made
it work. It took months, in-between, for them to
redesign it. And when we got them, they were just
an empty shell that we had to wire and put in all
the linkages. The cab part was a pain.”
It took Garner about five machines before every-
thing settled into a routine. By then, all the ma-
chines and parts had arrived and were stored on
racks or in shop bays according to machine serial
number, awaiting their turn. Each unit took rough-
ly six weeks to complete. All together there were
87 segments to each TSK build. The cab assembly
took one hundred hours each; cutting and fitting
the frame took another twenty-six hours. It was an
intense project that required focus, flexibility and
the drive to get it right.
Top to bottom: Peterson TSK in the woods; Customer Mike Pihl (R) was
part of the Ax Men reality TV series, pictured here with his Peterson
TSK.