Page 106 - Peterson 85 Years And Going Strong
P. 106
Top to bottom: Turbine at BP plant in Cusiana, Colombia; Brian
Kennedy/L & Gene Hamilton at installation in Cusiana, Colombia
Molano, Peterson’s contact at Energy Internation-
al—the local Cat dealer and general contractor
for the project—knows the political terrain well.
“Back then the security situation was very un-
stable. The guerilla group FARC [Revolutionary
Armed Forces of Colombia], has been in power for
the past fifty years, but today, the government puts
much more effort into dealing with their violence,”
explains Molano. Still, BP’s Cusiana plant was out
in the middle of a large savannah with dense eight-
foot-tall grass filled with drug traffickers and who
knows what.
“We were still babies at this thing,” states Hamil-
ton, who took Peterson technician Brian Kenne-
dy with him to help supervise the initial turbine
104 | PETERSON: 85 YEARS AND GOING STRONG
set up. “We had no clue. I spent a lot of time de-
veloping procedures on how to install and com-
mission our new mobile turbines and how to do
safety checks and develop customer relations. The
customer had no idea what they were doing either,
so it was a painful process compared to where we’re
at today.” At night Hamilton could hear gunshots
outside, beyond the compound’s double fencing
and barbed wire barrier. The Colombians told him
not to worry: “It’s just the troops out practicing
their marksmanship.” The job introduced a whole
new set of international logistics and legal issues
since it was Peterson’s first overseas turbine ven-
ture. Still, having even one turbine out on rent beat
a yard full of inventory sitting idle.
MARKHAM, ONTARIO
All along, Peterson’s strategy was to rent its way
to profitability versus selling the turbines at a loss.
It was that third turbine rental—in Markham,
Ontario in conjunction with Toromont, the local
Cat dealer—that ultimately kicked everything into
high gear. The Ontario Electric Corporation had
anticipated a power shortfall in the summer of 2003
and put out a request for proposals for 300 MW
of temporary power. Toromont-Cat won 98 MW’s
of the 300 MW to be sited in an open field in
Markham. The Markham project was a phenom-
enal success, going from green field to 98 MW of
power in just six weeks. For Peterson, it was the
very thing that ignited their mobile turbine market
and got the phones ringing again.
BECOMING SUSTAINABLE
Peterson has still not done any turbine business
in California—Hamilton’s initial target market.
“California was never the right fit for our busi-
ness model,” says Hamilton. “They wanted huge
50 MW turbines and our niche is 5 to 20 MW. And
they wanted to buy electric power for permanent
installations. They took a very different approach