TURBINE APPLICATIONS
BRIDGE POWER
Temporary power until the local utility brings power
to the site.
FAILURES
Emergency power while the customer’s turbines are
being repaired.
TURNAROUND
Stand-in power during scheduled maintenance of
customer turbines.
SHORTFALLS
Extra power during peak electricity needs.
106 | PETERSON: 85 YEARS AND GOING STRONG
always knew we would have to go internation-
al because these turbines serve a niche market,”
says Hamilton. “Jeff [Goggin] wanted everyone at
Power with the potential to be involved in interna-
tional business to have a passport. It was a realiza-
tion that the world was changing and we needed
to be prepared.”
SAN JOSÉ, COSTA RICA
One of Peterson’s largest and longest-running
projects was in Costa Rica for its national utilities
authority (ICE) from 2007 to mid-2010. Demand
for power was outpacing the country’s ability to
produce enough energy for its growing economy.
And on January 8, 2009, a 6.1 magnitude earth-
quake damaged some of the country’s hydroelec-
tric dams. “Costa Rica depends largely on hydro-
electric power as do most countries in this region,”
Top left to bottom: Costa Rica turbine installation; Close up of
installation; Gene Hamilton at the Costa Rica site