Page 491 - Peterson 85 Years and Going Strong
P. 491

Page 218 Page 226 Page 227 Page 234 Page 234 Page 240 Page 242 Page 250 Page 250
Page 251 Page 256 Page 259 Page 261 Page 263 Page 313 Page 315 Page 332 Page 334 Page 334 Page 341 Page 341 Page 341 Page 344
Page 346 Page 346 Page 346 Page 347 Page 348
Page 348
Page 348 Page 348 Page 349 Page 351 Page 351 Page 351 Page 352 Page 352 Page 353 Page 353 Page 354
Page 354 Page 359 Page 360 Page 361 Page 362 Page 364 Page 365 Page 365 Page 365 Page 366
Precision Ag technology on Challenger Tractor (2010), George Konzept, courtesy of Trimble Inc.
Traffic on SF-Oakland Bay Bridge, John Huseby, copyright 2019, Caltrans, all rights reserved
Top: Traffic on I-580 in East Bay Area, John Huseby, copyright 2019, Caltrans, all rights reserved
Top: Calaveras Dam near Sunol, CA under construction (2015), courtesy of Sukut Construction
Bottom: Calaveras Dam near Sunol, CA, completed (2019), courtesy of Sukut Construction
Wind turbines on the Altamont Pass near Livermore, CA, John Huseby, copyright 2020, Caltrans, all rights reserved Traffic on I-880 heading into Emeryville, CA, John Huseby, copyright 2020, Caltrans, all rights reserved
Top: AmNav’s tug, the Patricia Ann, courtesy of AmNav Maritime
Bottom: The Earl Redd is the very first vessel powered by Cat Tier 4 engines, built by Diversified Marine in 2016, Kurt Redd/Diversified Maritime
Diversified Marine facility in Portland, Oregon (2017), courtesy of Diversified Marine
K & E contract at Portland International Airport (Aug 2012), courtesy of K & E Excavating
Bottom/R: K & E’s Cat 336E hybrid working in Woodburn, OR ( June 2013), courtesy of K & E Excavating Bottom/L: Cat 374D excavator with 3D technology working in Eddyville, OR, (2012), courtesy of K & E Excavating Top: K & E equipment onsite on Bly Mountain job, courtesy of K & E Excavating
Right: DeSilva-Gates paving crew, courtesy of Rich Poppoff/DeSilva-Gates
Cat Certificate and Cat Training group photos, courtesy of Ernie Fierro/retired Peterson VP
Top: The Traverse departs McMurdo Station (Nov 12, 2018), Mike Lucibella/National Science Foundation
Top: South Pole Traverse (SPOT) tractors move at 7 mph (Nov 26, 2018), Mike Lucibella/NSF
Bottom: Delivering fuel to the South Pole station (Nov 12, 2018), Mike Lucibella/National Science Foundation
Top: Team Ghilotti’s Stretch D8’s Rebecca and Mary Ann (circa 2019), courtesy of Team Ghilotti
Below/L: Glen Ghilotti bought McMurdo’s Mary Ann in 2014 (circa 2015), courtesy of Team Ghilotti
Below/R: Father and son, Glen & Kevin Ghilotti, courtesy of Team Ghilotti
Oroville Dam main spillway after the DWR shut off the outflow from the damaged spillway (Feb 28, 2017),
Brian Baer/California Department of Water Resources (DWR)
Top/L: Excavation of erosion below damaged emergency spillway (Feb 27, 2017), Kelly M. Grow/CA DWR
Top/R: Aerial view of the damaged Oroville Dam main spillway (Feb 27, 2017), Dale Kolke/CA DWR
Bottom: Aerial view of Oroville Dam’s emergency spillway (Feb 23, 2017), Kasey Schimke/CA DWR
Dredging the Feather River for debris from the spillway break (March 16, 2017), Kelly M. Grow/CA DWR
Top: Buster Peterson Quad D9 excavating the emergency spillway at Oroville Dam (March 2, 1966), photo by CA DWR, courtesy Edgar Browning Photo Collection
Center/L: McDowell-Wellman wheel excavator used to excavate mine tailings (circa 1964-65), CA DWR (from Peterson archives)
Center/R: Ceremonial first pour of concrete at Oroville Dam (April 24, 1963), Don Logan/CA DWR
Bottom: Heavy equipment spreads material across Oroville Dam embankment ( Jan 12, 1967), CA DWR
Aerial of Oroville Dam nearly finished ( Jan 6, 1967), CA DWR (Peterson archives)
Top: Kiewit Liebherr cranes on the Oroville Dam main spillway (Sept 13, 2018), Florence Low/CA DWR
Center: Night work placing concrete on upper chute of main spillway (Oct 9, 2018), Florence Low/CA DWR
Bottom: Workers place RCC concrete on emergency spillway (Aug 16, 2018), Kelly M. Grow/CA DWR
Right: Cleaning rock foundation below Oroville Dam’s emergency spillway (Sept 13, 2018), Florence Low/CA DWR Left: Excavator breaks up the temporary concrete on main spillway (May 24, 2018), Florence Low/CA DWR
Top: Cat equipment prepares emergency spillway for next phase of splashpad ( June 25, 2018), Ken James/CA DWR Bottom: Cat equipment removes temporary road below main spillway (March 28, 2019), Kelly M. Grow/CA DWR Left: Buster Peterson Quad D9 used by Oro Dam Constructors at Oroville Dam (circa 1964-65), CA DWR (from Peterson archives)
Right: Wellman train car dumper unloads two cars at once (May 22, 1964), Vince Arrant/CA DWR
Peterson rental equipment powers work on Oroville Dam main spillway, ( July 19, 2018), Kelly M. Grow/CA DWR Aerial view of reconstructed Oroville Dam main & emergency spillways ( June 7, 2019), Florence Low/CA DWR Construction crews excavate erosion below emergency spillway (Feb 25, 2017), Kelly M. Grow/CA DWR
Tubbs Fire Cleanup in Napa County (Nov 4, 2017), U.S. Army Corps of Engineers, Sacramento District
Right: CAL FIRE dozer on Ferguson Fire, Sierra National Forest ( July 22, 2018), Kari Greer/US Forest Service Second down: Carr Fire cloud in Shasta & Trinity counties ( July 26, 2018), Eric Coulter, Bureau of Land Management Third down: Air support during the Carr Fire in Shasta County, CA ( July 2018), Neal Waters/Wildfire Pics
Fourth down: CAL FIRE truck on the Carr Fire ( July 26, 2018), Eric Coulter, Bureau of Land Management
Left: Carr Fire damage in Shasta & Trinity counties (Aug 8, 2018), Eric Coulter, Bureau of Land Management
 PHOTO CREDITS | 489
 


















































   489   490   491   492   493