DEFENSE INDUSTRY:
RESEARCH & DEVELOPMENT
The San Francisco Bay Area has a defense industry
that everybody knows about but few have actually
seen. Peterson’s TC equipment often goes out to
such jobsites, which are hidden behind layers of
security and red tape. “A lot of the stuff we do is
very tight-lipped,” says Young. “Our job is to get
in there, do our thing, and get out. No questions
asked.” In 2015, Peterson installed a low-tempera-
ture chiller for AMPAC Fine Chemicals, located
at the Aerojet site in Rancho Cordova. The system
was designed to deliver a negative 40ºF brine solu-
tion for their manufacturing process. “I don’t know
exactly what they do there,” says Young. “Some-
thing to do with chemicals and explosives. All I
know is that when I drive through the front gate,
there are guards with guns.”
HEAVY CONSTRUCTION:
L.A. HARBOR TUNNEL
In early 2000, the Los Angeles Port Authority let
a bid to bore a ten-mile horizontal tunnel beneath
the L.A. harbor for utilities. Seattle-based RKK
Soil Freeze bored a 150-foot deep vertical shaft at
each end of the proposed tunnel for access during
tunnel construction. Instead of using conventional
shafts shored up by rebar and concrete, they chose
to freeze the ground, creating thick permafrost
walls that needed no further stabilization. The 14-
foot diameter shafts were used to convey the large
drilling equipment down to bore the tunnel.
Our customers are selling security
and reliability to their customers. And we are
their backup.
– Jeff Goggin, chief operating officer,
Peterson-Cat
92 | PETERSON: 85 YEARS AND GOING STRONG
Matt George designed the chiller system to keep
the ground frozen solid during construction. “They
came up with the concept to drive into the ground
150-foot long, 4-inch diameter pipes, which
looked like long pieces of picket fence. Each of
those was like a capped wellhead—a pipe within a
pipe—where they’d pump calcium chloride down
into the center pipe at negative 20ºF. The closed-
loop system would absorb the energy [heat] and
bring that back to the surface. Eventually, they cre-
ated an eight-foot-thick wall of permafrost as solid
as concrete.”
From there, the contractor dug out the center,
leaving a hard-as-rock shaft that required no fur-
ther shoring. Then they could bore the actual tun-
nel underneath the harbor. After twenty months of
construction, they shut down the chilling system,
pulled up all the equipment and piping, then back-
filled the holes. “It was a pretty clever method but
relatively expensive, so they had to be very specific
where they used it,” says George. “But it was a very
fun project to be on.”
TELECOMMUNICATIONS INDUSTRY:
DOT-COMS
The growth of the Silicon Valley has had a tre-
mendous impact on Peterson Power Systems as a
whole, and its TC group in particular. Dot-coms
and data centers generate huge amounts of heat
that need to be managed and mitigated. “Heat
is a natural byproduct of computers. Every data
center needs cooling and maximum ventilation to
keep its computers and hard drives running,” says
Schalk. “Without the proper ventilation, all that
equipment will overheat and shut down.” When
the dot-com boom first hit in the early 1990s, a
lot of the buildings going up were pre-fab tilt-ups.
Vast amounts of money were waiting to be made
so they built quickly, using huge cranes to put up
four walls and a roof, often in one day. Some of
those dot-coms were ready to move in and get
started before they had the HVAC systems set up.