Page 93 - Peterson 85 Years And Going Strong
P. 93
BIOCHEMICAL INDUSTRY:
PHARMACEUTICALS
“There are several large Bay Area R&D facilities
where they have ten, twenty, even thirty years’
worth of research living in petri dishes,” says
Schalk. “If all of a sudden Genentech or Bayer los-
es power, all that work goes down the drain. So
they have N+1 backups at each of their facilities,
which is an extra backup generator to their backup.
We always make sure there’s a backup plan in place
in case there’s a power failure. I don’t want to be
the guy responsible for losing $10 billion worth of
research because the generator threw a belt and we
couldn’t get another one out there in time.”
COMMERCIAL BUILDINGS:
TRANSAMERICA BUILDING
In 2005, the owners of San Francisco’s Transamerica
building contacted Peterson Power about provid-
ing temporary cooling for a 48-hour maintenance
shutdown. At 48 floors and 853 feet tall, the Trans-
america Pyramid was the tallest building on the
SF skyline at the time. During the proposed shut-
Cooling the San Francisco Transamerica building in 2005
down, all but one of the floors would be fine. “Bank
of America’s main data center occupied the fifth
floor, where literally billions of dollars of transac-
tions flowed through per minute,” recalls Randy
Young. “At the time, it was their worldwide server.
And it was tied into the building’s central plant
cooling loop, which would be shut down during
those 48 hours. Those servers couldn’t afford to be
down even for five minutes.”
Young and his crew parked a 200-ton-capacity
chiller and generator out in front of the building
on Montgomery Street and ran hose up five flights
of stairs to the server room’s air handler. “The cross-
over was the tricky part since even a slight glitch
could expose our equipment to 48 floors worth of
pressure, which could rupture the hoses, drain out
all the chilled water from the loop, and take those
servers off-line for the rest of the weekend.” It was
a risk they carefully calculated for and monitored
throughout the weekend. “We were their lifeline
during that shutdown. Our total function was to
keep that server room alive.” Peterson’s TC group
completed the job successfully and got called back
for the next three years until the owners came up
with a permanent solution.
CHAPTER 6 | 91