Page 68 - Peterson 85 Years And Going Strong
P. 68
CORE VALUE: CUSTOMER FIRST
RUBY PIPELINE
It was the day after Thanksgiving 2009, somewhere east of Klamath Falls, Oregon. Peterson field tech
Jason Dolan was strapped to the deck of a Cat 345, hanging off the side of a mountain. He’d arrived on-
site an hour earlier for instructions.
“Where’s the machine you want me to fix?”
The job boss, Beau Cartwright, walked him up to the top of a hill and pointed
down. The crippled excavator sat two thousand feet below on a sharp incline—a
yellow speck in the distance.
You’re kidding.
Jason Dolan
“Load your tools into this
excavator bucket here,”
said Cartwright. “Then
hop on and we’ll give you
a ride down.”
“Thanks, but I think I’ll walk,” said Dolan. Nobody had
mentioned anything about hanging off the side of a
mountain at such a steep grade. What the heck had he
gotten himself into? After loading up his tools, Dolan
hoofed it downhill, sidestepping and sliding the length
of seven football fields. Fortunately, they had turned the
machine upright before they’d left for Thanksgiving two
days ago. It was tied down with guidelines so it wouldn’t
tip over again or slide down the hill. Climbing up onto
the machine’s deck, Dolan strapped himself into a safety
harness and reached for the engine cover. It was time to
get the thing running again.
The crippled 345 was part of a fleet of machines clear-
ing land for the Ruby Pipeline project—a $3 billion,
66 | PETERSON: 85 YEARS AND GOING STRONG

