home. The massive cleanup wrapped up four
months ahead of schedule after removing over
2.5 million tons of debris and contaminated dirt.
One reason was the payload scale technology sev-
eral contractors employed at their sites. “This was
brand new technology for us,” states Matt Wil-
liams, project manager for Sukut, who led the
SPSG team. “It was something we came up with
after the bid specs were already out. It’s relative-
ly accurate—within a couple percent. We worked
with Trimble [SITECH] to install scales on four of
our excavators so we could better utilize the yields
of the trucks.” Goodfellow Bros. had six Next Gen
Cat excavators with Cat PayLoad systems, bring-
ing the SPSG total to ten onboard scale machines
on the Camp Fire project.
Across town, Argonaut was working for FEMA
contractor ECC. All twenty-three of their exca-
vators on the north side of town were equipped
with onboard scales. “Argonaut had the most exca-
vator payload systems in Paradise,” explains Chris
Mata, SITECH salesman. “Eight excavators had
Trimble LOADRITE scales and fifteen new Cat
Next Gen excavators had Cat PayLoad systems.”
Mata was part of the Peterson-SITECH team
who spent several weeks on-site training operators
on the new technology since most had never used
it before. The team also re-calibrated all the Cat
payload systems as well as troubleshoot any sys-
tems issues.4
TRUCKLOAD EFFICIENCY
With 550 truckloads going to the landfill every
day, onboard scale systems made a huge difference.
Accurate payloads helped streamline the reme-
diation process both in time and cost-efficiency.
Once the machines were properly calibrated and
the operators were trained, it was a big plus for the
cleanup effort. “Load-control equipment allows
operators to load precise tonnage so they know
4 See the full story on pg 268, On the Job with Fred and Wilma.
when to stop,” explains Mata. “They can weigh
each bucket-load separately and calculate ton-
nage, versus eyeballing it the old-fashioned way,
which is less accurate for mixed loads of material
like burnt ash, partially burnt debris, and concrete
blocks.” Having the ability to zero out the scale
when material clings to the bucket is another ben-
efit. Without a payload system, efficiencies decline
and costs escalate as overweight fines accrue and
underweight loads mean more trips to the landfill.
The combined efforts of the Peterson-SITECH
team decreased lost tonnage by more than five
hundred tons per day, which netted out to forty
extra truckloads of debris every day. With a legion
of trucks capable of carrying anywhere from thir-
teen to eighteen tons each, that’s a lot of material.
We supplied the first round of gear
on the job because we met FEMA’s specs and
because we’ve built long-term relationships
with these contractors.
– Pat Puccinelli, central ordering manager,
Cresco
“We just happened upon this niche market for
load control,” explains Mata. “Trimble’s LOAD-
RITE technology has been around since 1979.
And Caterpillar has used their version successfully
on wheel loaders at landfills and mining operations
for years. But it’s new to fire remediation.” The in-
creased efficiency benefitted both the contractors
doing the work and the homeowners who planned
to rebuild. “These types of government contracts
demand fast turnarounds,” explains Mata, “because
the insurance industry imposes a two-year funding
window for rebuild starts. The onboard scales real-
ly helped operators work smarter to meet and beat
the deadline.” The October 23 pull-out date was
the real proof.