Cat rental generators and air compressors from Peterson helped power Kiewit’s jobsite during the spillway project
on a boat and headed upriver. It was pretty intense
stuff there at the beginning. And all of it was 24
hours a day.”
By the time Kiewit was finished, Peterson’s service
totaled 16,600 man hours. That’s basically eight
technicians-worth of work for a year. “I have six
guys in the Chico field crew, and sometimes all six
would be out there on the dam at once. When you
have multiple things going on, or you need two
guys on a repair because the equipment is so large,
that’s when the other Peterson stores would chip
in and help out with our regular customers. It was
definitely a whole team effort.”
CITY ON A HILL
In addition to all the earthmoving equipment,
Peterson had several generators on the job. They
were the life blood of the entire operation. The site
was like a small city—30 miles from Chico—so all
their electricity had to be produced by generators.
And they needed a lot of it. From office buildings
and A/C and computers to light towers, batch
plants and pneumatic hand tools, the project was
huge and needed power to keep it running. The
spillways also required a lot of generators to pow-
er lights, tools, and hydro-washers. And all those
generators needed support.