REPOWERING A MONSTER (JUNE 2016)
The largest off-road job Peterson has tackled so far is Sukut’s 5110B mass excavator used out at Calaveras Dam in
Sunol, California. By late 2013 it had already been on the job for two years and was getting tired. And in the realm
of emissions regulations, its Tier 1 engine was a dinosaur. Peterson Parts and Service rep Bob D’Amore quoted
Sukut two repair options: a $150,000 engine rebuild and a $650,000 repower. “The engine had almost 14,000 hours
on it and needed a complete rebuild,” explains D’Amore. “Or they could put in a brand-new Tier 4 final, be emis-
sions-compliant, and get a three-year, 5,000 hour guarantee from us.” Mike Ortiz, president of Sukut Equipment1
,
chose the long-term solution, the Tier 4 final repower.
The San Bernardino-based, heavy equipment rental firm has done over two hundred repowers since the off-road
emissions mandate came down in 2007. “We’ve actually repowered our equipment twice,” says Ortiz. “First on a
number of Tier 0s to Tier 1, and then again from Tier 1 to Tier 3.”
Sukut Construction is one of the largest heavy civil general contractors in the Western region. They began work on
the Calaveras Dam Replacement project in 2011 in a joint venture with
Dragados USA and Flatiron West. Sukut utilized 100 percent Cat equip-
ment on the extensive project. The three companies had 50-60 pieces of
iron on-site, depending on the phase. Each brought their own equipment
and expertise to the party. “The Cat 5110 was something we already had
in our fleet,” says Ortiz. “It was the perfect tool for what we needed
there.” It also played a key role on the job. According to D’Amore, the
giant excavator was the best match for their fleet of Cat 773 and 775
off-highway trucks. “It’s the machine of choice for these trucks because
it’s got the right size bucket. It can load out a 775 in three passes.”
Top to bottom: Peterson’s Doug Brecheisen
working on Sukut’s 5110B onsite; 800 hp C27
engine at the San Leandro shop yard
The 5110 repower was a big deal from start to finish. The 145-ton machine
was disassembled, and only the car-body was hauled into Peterson’s San
Leandro shop. Just getting the 50-ton housing off the truck and situated
inside the shop drew a crowd. The job required a new cooling system and
radiator, which they adapted from a 775 off-highway truck. “The new en-
gine is an 800 horsepower C27. It’s a monster,” says Stickney, Peterson’s
Emissions Solutions manager. “We used the cooling system out of a brand
new 775G off-highway truck because that’s the machine that has a C27.
1 a subsidiary and rental arm of Sukut Construction
When you do a one-off of anything, there’s always issues afterward.
But not the 5110. I was really impressed. I flew up to Peterson one day and told
them so.
–  Mike Ortiz, president of Sukut Equipment
228 | PETERSON: 85 YEARS AND GOING STRONG