who worked sixteen hours straight the first night. “We didn’t keep track of how many we worked on because
we didn’t have time to write anything down. It was just blow and go.”
Visibility at night was tough even with construction lights stationed at regular intervals. “They blew out a lot
of hydraulics because the operators kept banging into stuff,” recalls Harden. “They couldn’t see very well be-
cause of all the glare and dust. Ferma had as many light towers as they could get their hands on, but it was still
dark. And dust was flying everywhere.” Giant fans shot water out over the crumbling roadway to help manage
the dust generated by 285,000 square feet of falling concrete. It felt like a continual downpour to Harden and
his teammates. “We got pretty wet out there. We were running and things were falling. They were cutting
those decks of freeway that fell thirty, forty feet to the ground. And they were hammering concrete to break it
all up. And then shooting that heavy spray of water out to help settle the dust. It was chaos. That was a night.”
To watch the process was to witness a carefully choreographed affair with seven teams of six excavators
each, spread out across the old highway, their long necks reaching out for another bite. “When it was done,
you could see section after section
of freeway slabs fallen onto each
other,” recalls Harden. “It was like
watching dominoes fall.” To Fer-
ma’s credit, no one got hurt, thanks
to all their careful planning. Not
even a cut thumb. According to
Caltrans District 4 Director Bi-
jan Sartipi, “The demolition was
an amazing feat of engineering. A
fleet of forty excavators demolished
151 bridge spans and 307 columns
to the cheers of those watching. It
was a rare opportunity to be a part
of history.”2
During the entire weekend, Peter-
son’s field techs did shifts around
Ferma had 60 excavators on the Doyle Drive contract to beat the clock on the time-sensitive job.
the clock, one team working while
the other slept a few miles away.
“Peterson took very good care of us while we were there,” says Harden. “You couldn’t park your service truck
at the hotel so they brought us a pickup so we could rotate back and forth to the hotel while our service trucks
stayed on-site. It was hard to sleep though because we were so amped up. We were all like zombies.”
In the end, Ferma’s strategy worked so well they finished ahead of schedule, enabling the general contractor to
pave the temporary bypass and complete the job eight hours early. When the weekend was over, Harden and
his teammates were still not finished. They spent several days breaking down all the equipment and loading it
onto trucks to be hauled back home. “That deadline wasn’t nearly as stressful as getting the commuters back
on the road, but by then we were just so tired and so done. Mentally and physically,” says Harden.
2 “Gate Keepers.” Construction & Demolition Recycling, Aug. 31, 2012.
184 | PETERSON: 85 YEARS AND GOING STRONG