Page 183 - Peterson 85 Years And Going Strong
P. 183
The reason we exist
At 8 p.m. on Friday, April 27, 2012, a fleet of Cat-
erpillar excavators rumbled out to their starting
positions along the elevated deck of Doyle Drive.
They had just twenty-four hours to demolish over
five thousand feet of pavement so a temporary by-
pass could be built before Monday morning’s five
o’clock commute. The countdown was on.
San Francisco’s $1.1 billion Presidio Parkway Proj-
ect was designed to bring the southern approach
of the Golden Gate Bridge up to current seismic
standards. The 1.6-mile stretch of US-101 was
originally commissioned back in 1936 along with
the Golden Gate Bridge. The old roadway had
sustained only superficial damage during the 1989
Loma Prieta earthquake, but it awoke Caltrans
and city officials to its increasing vulnerability to
future seismic events. The current project had been
fifteen years in the making, all funded by federal
stimulus money.
Long-time Peterson customer Ferma Corp. had
the demolition portion of the contract. Due to
the tight schedule, they couldn’t afford any down-
time so they rented everything they could get
their hands on to beef up their own fleet. Much
of it came from Peterson. “Lots of people said it
couldn’t be done but we made sure that we had
every possible excavator available to them during
that job,” says John Krummen, executive VP and
general manager of Peterson Power Systems. “The
only way Ferma could win that contract in the first
place was to beat out the competition on time be-
cause they weren’t going to come in the lowest bid.
So they planned to take that bridge down in record
time.”
CHAPTER 11 | 181